{"id":657,"date":"2024-02-15T09:00:00","date_gmt":"2024-02-15T00:00:00","guid":{"rendered":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/?page_id=657"},"modified":"2024-05-07T10:59:45","modified_gmt":"2024-05-07T01:59:45","slug":"sg05003","status":"publish","type":"post","link":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/general\/sg05003_g.html","title":{"rendered":"Subgrade Soil Stabilization\u3000DEEP-STABI"},"content":{"rendered":"\n<div class=\"wp-block-columns common_container tech_info_container is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column container_left is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<h3 class=\"wp-block-heading\">Overview<\/h3>\n\n\n\n<p>This is a construction method that stabilizes the existing subgrade soil by adding and mixing cement and lime in situ. The finished thickness of one layer is 30 to 100 cm.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Features<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>It is possible to improve the existing subgrade to a subgrade with greater bearing capacity, making it possible to reduce the thickness of the pavement and making it more economical.<\/li>\n\n\n\n<li>Since it is possible to improve the soft subgrade without replacing it, no excavated soil is generated and the construction process can be shortened.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Uses<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Improving the soft subgrade<\/li>\n\n\n\n<li>Reducing the thickness of the pavement by increasing the bearing capacity of the subgrade<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Related<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"\/en\/tech_info\/general\/sg05001_g.html\">BASE-STABI<\/a><\/li>\n\n\n\n<li><a href=\"\/en\/tech_info\/general\/sg05005_g.html\">MAD-STABI<\/a><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.nippo-c.co.jp\/tech_info\/images\/general\/large1\/SG05003_1.jpg\" alt=\"\"\/><figcaption class=\"wp-element-caption\">Subgrade stabilizing by DEEP STABI<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.nippo-c.co.jp\/tech_info\/images\/general\/large2\/SG05003_1.jpg\" alt=\"\"\/><figcaption class=\"wp-element-caption\">Mixing status attributed to the use of super-deep stabilizers (treatment thickness: 1m)<\/figcaption><\/figure>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>This is a construction method that stabilizes the existing subgrade soil by adding and mixing cement and lime in situ. The finished thickness of one layer is 30 to 100 cm.<\/p>\n","protected":false},"author":1,"featured_media":1233,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[199],"tags":[],"search-place":[225,218],"search-material":[228],"search-function":[],"search-damage":[],"search-needs":[249],"features":[254,259,260],"class_list":["post-657","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pave-surface-treated","search-place-place-base","search-place-place-premises","search-material-material-soil","search-needs-needs-strong","features-availability","features-economy","features-maintenance"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/posts\/657","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/comments?post=657"}],"version-history":[{"count":1,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/posts\/657\/revisions"}],"predecessor-version":[{"id":1865,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/posts\/657\/revisions\/1865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/media\/1233"}],"wp:attachment":[{"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/media?parent=657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/categories?post=657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/tags?post=657"},{"taxonomy":"search-place","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/search-place?post=657"},{"taxonomy":"search-material","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/search-material?post=657"},{"taxonomy":"search-function","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/search-function?post=657"},{"taxonomy":"search-damage","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/search-damage?post=657"},{"taxonomy":"search-needs","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/search-needs?post=657"},{"taxonomy":"features","embeddable":true,"href":"https:\/\/www.nippo-c.co.jp\/en\/tech_info\/wp-json\/wp\/v2\/features?post=657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}